Hiding an unsightly structure below grade is a good idea—if the walls hold. That was precisely the problem with the walls in the Stagecoach Compressor Station in Owego, N.Y.

By Becky Felling

A geogrid-reinforced solution prevents removal of existing wall

Hiding an unsightly structure below grade is a good idea—if the walls hold. That was precisely the problem with the walls in the Stagecoach Compressor Station, constructed as part of an underground natural gas storage facility owned by Central New York Oil and Gas Company, LLC (CNYOG), in Owego, N.Y. After an inadequate castin- place wall buckled under the weight of the earthen berm built to hide the structure, a geogrid-reinforced Keystone retaining wall was chosen to take the load off the berm without the need to remove the existing wall.

According to Greg Piper of Keystone product supplier Domine Builders Supply, Rochester, N.Y., approximately 4,000 square feet of Keystone standard units—a preferred product for tall walls and critical structures—were used on this project. The existing wall is composed of reinforced concrete and stands approximately 30 feet above the interior finished floor and is approximately 93 feet in length. On the exterior face, the earthen berm constructed to "hide" the structure varies from approximately 17 to 24 feet in height at the ends of the wall to 28 feet high at the middle.

Wall failure and redesign

The wall initially failed when the wall stem contacted the interior structural steel frame, causing the columns to be nearly 6 inches out-of-plumb. Hawk Engineering, PC, of Binghamton, N.Y., was contacted to find a solution to the problem. The wall was temporarily stabilized with a steel brace designed by Hawk Engineering. The original contractor removed the berms and the wall stem returned closer to plumb. The original engineer redesigned the berm using a wedge of geofoam (expandable polystyrene) between the wall and the berm.

However, the wall failed again and Hawk Engineering was hired to redesign the berm. According to Hawk Engineering’s Structural Department Manager Robert P. Jahelka, P.E., the first step was to analyze two options for the mechanically stabilized earth wall. "The first was a system with the geogrid wrapped around the berm face. The second included the construction of a modular block wall adjacent to the concrete wall," said Jahelka. "Analysis indicated that the ‘wrapped’ option would likely exert lateral pressure on the concrete wall. Therefore, the modular wall option was selected." The choice of a segmental retaining wall initially surprised Leo Dradinsky of Calvin C. Cole, Inc., the project’s contractor. "My first thought was that it seemed like an expensive use of a modular retaining wall that would be completely buried and not at all visible," Dradinsky said. "But, using the segmental wall later made a lot of sense because the removal of the failed wall was unnecessary.

They didn’t have to pay to have the wall removed or have to shut down the natural gas operation during demolition and re-construction." A plan of success A mechanically stabilized earth system was designed using a Keystone segmental retaining wall and geofoam between the segmental wall and the concrete wall; and geogrid was used to reinforce the earthen berm. The geogrid was pinned to the modular units as courses were completed.

The first course of modular units was placed on a sand cushion on the existing footing.The modular wall "stepped" back at approximately 15 feet and at 22 feet above the top of the footing. The "steps" were placed on an 8-inch compacted stone leveling pad. Drainage fill was placed within and behind the modular units. New York State Department of Transportation Item 4 was used for the earthen berm. The soil was placed in 8- inch lifts, compacted to 95 percent of the maximum density as determined by the ASTM D1557 compaction test. A highdensity polyethylene (HDPE) liner was placed on top of the geofoam, which connected and sealed to the concrete wall to prevent water infiltration.

The Stagecoach Storage Project has a working gas capacity of up to 13.6 billion cubic feet, with the capability to withdraw as much as 500 million cubic feet per day (MMcf/d) and inject as much as 250 MMcf/d.

The Stagecoach Storage Project called for a product that was strong enough to handle heavy lateral loading. Because of the Keystone standard unit’s integrity and ease of installation, along with the problem-solving skills of the Hawk Engineering team, the Stagecoach Storage Project is now a model for largescale wall repairs and re-engineering.

Becky Felling is director of marketing at Keystone Retaining Wall Systems, Inc., a CONTECH Earth Stabilization Solutions Company. She can be reached at 1-800-747-8971, or via e-mail at bfelling@keystonewalls.com.

 
Related Engineering Channels




Headlines From Around The Web







Current Issue

cover May 2012

» Cover Story
A brighter outlook

» Features
Products and services

All articles     eZine    Subscribe

Cover Story

A brighter outlook

After years of ups and downs, cautious optimism greeted 2012. While economic progress lagged in 2011, this year started off with most in the consulting engineering industry adjusting and rising to the challenges of a volatile economy.


News


New & Noteworthy


Places & Faces


From The Publisher


Comments



Events